Maison BeaulieuMAISON BEAULIEUAB ÉDITIONS · CULINARY ARTS & ARCHIVES
Private Editions · Transmission

An Extension Appears on an Old Plan: When Can You Tell Its Story as Built?

Opening a family folder, you find two drawings of an enlarged kitchen and a photograph of the courtyard. On the first drawing, the kitchen has two openings and a small lean-to. On the second, a single opening looks onto the courtyard. The memory passed down in the family fits into one sentence: “We redid that whole part of the house at the end of the seventies.” For your book, you must decide what you can write about the room, the openings, and the lean-to. Each of these details may have left a different trace. The example that follows is fictional.

Give Each Date Its Own Verb

In February 1978, plan A shows two openings and a lean-to. Copy down its date and the title written on the drawing. On your record sheet, assign it a verb: “depicts” or “proposes.” In June of the same year, plan B bears the label “variant” and a revision index. It draws a single opening and leaves the courtyard clear where the lean-to stood. The temptation would be to read these two sheets as a before and after. The sequence of dates gives the sequence of two drawings; it is not enough to establish that a lean-to occupied the courtyard and then disappeared.

🎁 Free Heritage Gift · A4 Illustrated Booklet + 5 MP3s

Receive the “Pantheon of 28 Legendary Chefs” Dossier (Free A4 PDF) + 5 Audio Stories

Instant complimentary access to our illustrated gastronomic & historical dossier, plus 5 DRM-free MP3 audio chronicles.

The fictional September decision expressly cites plan B by its index. That is the link that lets you write that the decision refers to this variant. On your sheet, note on one side what the decision identifies and on the other what the identified sheet shows. You will then be able to return to the right item even if the drawing is reproduced without its title block. If the decision names no version and the drawings are filed side by side, leave the linkage box open. The folder’s physical arrangement helps you locate the sheets; it does not tell you which one was approved.

Read dates where they sit. A sheet may carry one date in the title block and another on a filing stamp. An index written near the title-block date serves to identify the drawing; the stamp here indicates when that sheet was received. When you transfer everything onto a timeline, keep one entry per act rather than a single date per document. A sheet drawn in June, filed in July, and cited in September gives three anchor points. Collapsing them into “September plan” would erase the revision work that preceded the decision.

The Archives de Paris note that the contents of their building files vary and may include, depending on the file, plans, a decision, and completion records. That variety invites you to record what you actually have in front of you. Write “decision consulted, cited plan located” on your sheet if you hold both. If you have only the decision, record the index it gives and leave the drawing marked as still to be found. Your reader will thus know why you can speak of a decision and where the description of the layout stops.

Compare Two Drawings Without Inventing a Sequence

In the Parisian inventory of plans extracted from fonds VO11, two entries describe the sixth floor of the same address. VO11 124(1) covers the floor after alterations and VO11 124(2) covers its earlier state. Neither cited entry gives a date for the works. One can use this finding aid to locate the drawings; at this stage, a caption grounded in the inventory must remain at the level of the descriptions it provides.

Now imagine two unindexed sheets, both bearing the same date. The first shows the courtyard elevation and the second depicts a cross-section. An opening absent from the section may sit off to the side, outside the plane along which the drawing slices through the house. To compare them, trace the section line on a floor plan or look for reference marks linking the two views. If you cannot place the section line, write separately what the elevation depicts and what the section lets you read. You will avoid turning the difference between two types of drawings into a change of design.

In a second case, two elevation drawings carry the same date yet diverge on the detail under study. One may be tied to a decision by an index while the other remains unattached. Note the title, the portion of façade, any visible number or letter, and the reference of the document linking them. Look first for landmarks that another person can read on both sheets: a wall setback, the position of a downpipe, or the distance between two axes are useful if they distinguish the versions. A dimension found on a single drawing can help situate a detail in the book, yet it does not replace the link between the decision and the drawing.

Separate Material Delivery, Installation, and Declared Completion

In the fictional folder, a 1979 letter announces that the door and window frames have arrived. Record “arrival of frames reported” under the date of the letter, along with the writer’s name and the location if specified. If the letter does not date the arrival itself, leave that date open. A second column collects observed details; for the kitchen opening, it stays empty at this stage. You know a delivery was reported. The letter may say neither where the frames were unloaded nor which opening they were meant for. That distinction prevents you from illustrating the delivery passage with a photograph of the opening while presenting the two as contemporaneous.

Suppose you find a supply invoice and an installation invoice. Check each one for the location and description of the work. The installation may concern an upstairs window rather than the ground-floor opening. A line that reads simply “installation of joinery” conveys a different level of detail from one that names the kitchen opening onto the courtyard. Keep the invoice date distinct from any work date explicitly stated on the document. If the estimate and the invoice use the same wording but the invoice repeats only part of the estimate, note the missing line. That detail can explain why you attribute one intervention to the project without describing the entire scheme as carried out.

In 1980, a fictional completion declaration refers to the extension in general and does not itemise the openings. On the timeline, enter “completion declared for the extension.” In the row reserved for the opening, keep the drawing and the decision that concern it. Leave the reported arrival of the frames in the general project row until a document connects it to that specific opening. Two sentences in the book can therefore be written at different levels of precision: you can recount the declared end of works in 1980, then introduce the courtyard photograph at its own date. If you merge the sentences, the reader risks attributing to the declaration a description it does not contain.

Another situation arises if the declaration covers only one phase—say, the main kitchen volume—while the lean-to appears on a separate sheet. Compare the exact wording of the phase with the vocabulary you use in your book. If you call everything in the folder “the enlargement,” you give the document a wider scope than its own wording warrants. To help the reader, name the part declared complete in the sentence and place the other proposals in a separate caption. You can then tell the story of a phased build without assuming that every drawn stage was constructed.

Give the Photograph the Scope of Its Framing

In our example, the back of a family photograph reads “1981,” added later by a relative. The view is oblique: one opening is visible, and the corner where the lean-to would have stood lies out of frame. The caption can name the opening and attribute the year to the inscription. If the chapter depends on that date, look for a second trace to help anchor it—for instance, a contact sheet or batch of prints whose provenance and dates are established. A recognisable event elsewhere in the album can guide the search, but you still need to connect the courtyard view to that event. Until that link is in place, keep what the image shows separate from the proposed year.

Another photograph is firmly dated to 1984 for the sake of the exercise. It shows the courtyard façade and the site of the lean-to with no visual obstruction. One opening is visible on the stretch of wall under study, and no lean-to appears in the visible area where plan A drew it. Anchor the area using the wall return and the edge of the courtyard as landmarks. You can then write that the opening is visible in 1984 and that the space planned for the lean-to is clear in this view. The image leaves open the history of that spot both before and after the photograph was taken.

Add an attested view from 1977. The same stretch of wall is unobstructed and sharp enough to verify that no opening existed at the spot under study. You now have two states separated by seven years. Between them, that portion of wall changed. The comparison dates neither the initial installation nor any subsequent replacements. If you find an earlier view where the wall is hidden by a tree, it does not alter the comparison. On your working plate, mark the landmark that confirms it is the same stretch of façade. That annotation is more useful during proofreading than an arrow pointing directly at the newer opening.

Think as well about cropping on the printed page. If the 1984 photograph serves to establish that the courtyard corner is clear, the layout must keep that corner. For a family portrait in front of the kitchen, you might prefer a tighter crop. In that case, write a second caption describing the people and the portion of the building actually visible, or pair the page with the full view. The reader must be able to find in the image the detail the text asks them to observe. A precise caption beneath an image cropped in the wrong place loses part of its support.

Search for the Missing Sheet Without Filling the Blank

The Archives municipales de Nancy note that plans submitted for review to the public health office were kept separately from the main files through 1976 inclusive. For a file from that fonds and period, that arrangement provides another lead if the plans are missing during consultation. The fictional 1978 file discussed here is distinct from that archival case; for it, one would need to record provenance and check the corresponding inventory.

In your notes, reserve different phrases for the situations you encounter. “Plan to be sought under another call number” implies a cross-reference gives you a lead. “Sheet identified, not yet consulted” indicates you have its reference but have not yet examined it. “No sheet found among the items consulted” sets the boundary of your search. “Corner out of frame in photograph” concerns what the photograph allows you to see. Each of these four phrases calls for a different next step, from tracking down a call number to searching for another view. Together, they prevent you from interpreting a gap in consultation as a physical state of the building.

If a relative remembers walking through the lean-to, record where they entered it and which room they reached next. That may provide a clue distinguishing the drawn lean-to from another courtyard shelter. Note the wording of their recollection and when they told it. In the book, the remembered scene can be quoted as such. To date the fabric itself, return to the plan of the area and look for a view in which that corner is legible. This back-and-forth respects memory without forcing it to carry the chronology of the entire house alone.

Choose a Sentence for the Page

With only the drawings and the decision, the sentence can stop at the design: “The June 1978 variant, cited in the September decision, draws one opening onto the courtyard.” With the fictional declaration, add a sentence on the extension: “Completion of the extension was declared in 1980.” With the dated photograph, give the detail its visual anchor: “The opening is visible in the 1984 photograph.”

To bring these elements together on the page, place references as close as possible to the information they support. If the variant is reproduced facing the photograph, give each one a date and a verb. The first shows what was drawn; the second lets you see a state of the courtyard. Between the two, the working chronology preserves both the available traces and their gaps. The reader can thus compare the proposed scheme with the visible state of the courtyard, while the pairing of the two images leaves open how much of the drawn project actually guided the work.